Planning Projects

The proposed Wekiva Trail is identified in two trail master plans completed in 2008.  A feasibility study for the trail was completed in 2011 and a Project Development and Environment (PD&E) Study is currently being conducted for the proposed trail.  Click on the links below to access these studies.

Description
File Type
Size
 
 
Lake County Trails Master Plan
-
-
Sect 1.0 Excutive Summary
PDF
7.4 mb
Figure 7-1 Priority Trails
PDF
1.3 mb
Figure 7-19 Lake Wekiva Trail
PDF
1.7 mb
Figure 7-20 Lake Wekiva Trail Implementation
PDF
1.5 mb
Mt.Dora Trails Master Plan
-
-
Sect 1.0 Executive Summary
PDF
13.7 mb
Trails Master Plan Potential Network
PDF
6.8 mb
Wekiva Trail Feasibility Study
-
-
Final Technical Memorandum - Feasibility Study
PDF
41 mb
PD&E Study Study
-
-
PD&E Study - BPAC Presentation
PDF
3 mb
Predictive Economic Impact
PDF
845 kb
Economic Impact Final
PDF
771 kb